Temporary South Hill Reservoir Shutdown Possible Reduction of Water Pressure
Moose Jaw, SK
The City of Moose Jaw advises that the Engineering Services Department have a planned shutdown of the South Hill Reservoir Pumphouse starting Monday, October 25, 2021.
It is anticipated that the South Hill Reservoir Pumphouse will be back in service on Monday, November 1, 2021 pending regulatory water sample test results. During this period, there will be NO water supply interruption but reduced water pressure may be experienced by some properties.
The purpose of this shutdown is to allow for a structural inspection of the water reservoir.
Thank you for your patience during this project.