E-Permit Service
Submit your Building Permit Application online.
Our e-Permit Service allows you to submit your Building Permit Application online.
Save time and multiple trips to our office and start your project sooner by submitting
and managing your Permit Application online!
This link directs you to an external page
Commercial Alteration
What is this Permit?
A Commercial – Alteration Permit is required when an applicant intends to modify all or part of an existing commercial, industrial, or institutional building or structure located on a property they own or are authorized to act on behalf of the owner, but without changing gross floor area or building height. Examples of alterations include removing interior walls, replacing windows, or reconfiguring interior layouts—as long as the work does not expand the building’s footprint or volume. The property owner must authorize the alteration, and the application must be submitted by the owner or an authorized representative.
What is not a use for this permit?
A Commercial – Alteration Permit does not cover any work that involves expanding the building. If you are planning an addition, you must apply for a Commercial – Addition Permit instead. You can apply for the Commercial Addition permit here
Required forms and Documents:
To be Finalized
Commercial Addition
What is this Permit?
A Commercial – Addition Permit is required when an applicant intends to expand the gross floor area or building height of an existing commercial, industrial, or institutional building or structure located on a property they own or are authorized to act on behalf of the owner. The property owner must authorize the addition, and the permit application must be submitted by the owner or an authorized representative.
You can apply for the Commercial Addition permit here.
Required forms and Documents:
To be Finalized
Commercial New
What is this Permit?
A Commercial – New Building Permit is required when an applicant intends to construct a new commercial, industrial, or institutional building or structure on a property they own or are authorized to act on behalf of the owner. The property owner must authorize the construction, and the permit application must be submitted by the owner or an authorized representative.
You can apply for the New Commercial Building here
Note: To review the full list of submission requirements for new commercial buildings, please refer to the Type B Checklist, which outlines all required documents and drawings. To review the regulations for new commercial buildings, please refer to the Commercial, Industrial, Institutional or Multi-Unit Residential Development Info Sheet, which outlines all required documents and drawings.
Required Forms and Documents
| Commercial - New | Required to Submit | Required to Issue | Condition Fulfillment |
|---|---|---|---|
| Commitment of Field Review Letter | Yes | ||
| Electrical Drawings | Yes | ||
| Electrical Permit | If Applies | ||
| Energy Efficiency Calculations and Forms | If Applies | ||
| Estimated Peak Water Level Confirmation | If Applies | ||
| Floor Plan | Yes | Yes | |
| Floor Truss Design | If Applies | ||
| Floor Truss Layout | If Applies | ||
| Gas Permit | If Applies | ||
| Grading Plan | Yes | ||
| Letter of Assurance | If Applies | ||
| Mechanical Drawings | Yes | ||
| Plumbing Permit | If Applies | ||
| Real Property Report | If Applies | ||
| Roof Truss Design | If Applies | ||
| Roof Truss Layout | If Applies | ||
| Site Plan & Civil Drawings | Yes | Yes | |
| Site Servicing Plan | Yes | ||
| Spray Foam and Thermal Barrier Approval | If Applies | ||
| Stormwater Runoff Estimates | If Applies | ||
| Structural Drawings | Yes | Yes |
Commercial Demolition or Removal Permit
What is this Permit?
A Commercial – Demolition or Removal Permit is required when an applicant intends to demolish all or part of an existing commercial, industrial, or institutional building or structure located on a property they own or are authorized to act on behalf of the owner. The property owner must authorize the demolition, and the permit application must be submitted by the owner or an authorized representative. If you plan to demolish and add an addition, you will only need to fill out a Commercial Addition Permit.
If you plan to demolish and rebuild immediately, you may:
- Submit a single application under the Commercial – New Permit, or
- Submit each application separately.
You can apply for the Demolition or Removal permit here
Note: For more details on the demolition process, please refer to the Demolition Info Sheet, which outlines key information every applicant or property owner should know before proceeding with the demolition of all or part of a building or structure.
Required forms and Documents:
E-Permit Service
For Further Information, Please Contact:
Community Services – Planning and Development Branch
3rd Floor, 228 Main Street North, Moose Jaw, SK S6H 3J8
Phone: 306-694-4443 | Email: planning@moosejaw.ca
This link directs you to an external page
© City of Moose Jaw, Saskatchewan. All rights reserved.
Disclaimer: The email addresses and contact forms provided on this website are intended solely for official communication with the City of Moose Jaw. They shall not be used to send unsolicited email messages.

